Our Work

2 year guarantee on all workmanship carried out by Groves Gas

Shower Room Installation

What we did

• Remove & disposure of existing sanitaryware, wall & floor coverings.
• Dig floor to accommodate new shower waste.
• Plaster walls to either side of new shower enclosure & oposite wall.
• Use waterproof tanking membrane in new shower enclosure area.
• Supply & fit new Eastbrook Volente shower tray & fast flow waste.
• Supply & fit white snow Multipanel shower boards.
• Supply & fit Mira Coda Pro thermostatic bar shower mixer with chrome slide bar & shower head.
• Supply & fit Eastbrook walk in shower screen and flipper panel.
• Supply & fit Bemodern basin unit in Dune Oak including breeze slab top basin.
• Supply & fit Bristan Java basin mixer tap & clicker waste.
• Supply & fit Bemodern WC unit in Dune Oak., including back to wall pan & soft close seat.
• Supply & fit two Bemodern Dune Oak base units.
• Supply & fit Bemodern gloss white laminate worktop.
• Supply & fit white paneling over exposed pipework to the side of furniture run.
• Clean & seal new bathroom.